|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
9.6 Consider Approval of the Silver Valley High School Auto Shop Heater Replacement with Bradley General Building |
|
|
Strategic Plan:
|
|
Enclosure:
|
BGB SVUSD High School Autoshop Heater Proposal v1.PDF |
|
|
File Attachment:
|
|
Summary:
|
The High School Auto Shop heaters are in need of replacement. Both of the existing units have crack heat exchangers and cannot be repaired due being a discontinued product. The damaged heat exchangers are a source for carbon monoxide, which is a major safety hazard for students and staff. Both units will be replaced and additional ventilation work will be added to ensure proper ventilation is provided. All work and materials to be furnished by Bradley General Building. |
|
|
Funding:
|
|
Recommendation
|
It is recommended that the Governing Board of Trustees approve the Silver Valley High School Auto Shop heater replacement with Bradley General Building. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Robert Saffel - Senior Director of Technology, Maintenance and Operations |
|
Signed By: |
|
Robin Schreiner - Senior Director, Business Services |
|
Signed By: |
|
Marc Lacey - Assistant Superintendent, Administrative Services |
|
Signed By: |
|
Jesse M. Najera - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Mark Staggs Moved, Member Lynn McKee seconded to approve the Original motion 'It is recommended that the Governing Board of Trustees approve the Silver Valley High School Auto Shop heater replacement with Bradley General Building.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 |
|
|
|
|
|
|