Meeting Date:
|
3/4/2025 - 5:30 PM
|
Category:
|
BUSINESS SERVICES
|
Type:
|
Action
|
Subject:
|
9.2 Consider Approval of Fence Line Replacement at the Alternative Education Center with Bradley General Building
|
Strategic Plan:
|
|
Enclosure
|
Bradley AEC Fence Replacement and Brush Removal.pdf
|
File Attachment:
|
|
Summary:
|
The Alternative Education Center campus provides facilities for the Adult Education Center. The existing fence line between the Adult Ed facilities and the general campus needs replacement. The fence line has been irreparably damaged by the Oleander trees and age. A 200-foot section will be replaced with a six-foot-tall, 9-gauge privacy link fence. Any existing Oleanders and brush along the fence line will be removed.
The contractor will remove and haul away any debris.
|
Funding:
|
Adult Ed Funds: $24,900.00
|
Recommendation:
|
It is recommended that the Governing Board of Trustees approve the replacement of the fence line at The Alternative Education Center with Bradley General Building, as presented.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Robert Saffel - Senior Director of Technology, Maintenance and Operations
|
|
Signed By:
|
|
Robin Schreiner - Senior Director, Business Services
|
|
Signed By:
|
|
Marc Lacey - Assistant Superintendent, Administrative Services
|
|
Signed By:
|
|
Jesse M. Najera - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Mark Staggs Moved, Member Brian Boatwright seconded to approve the Original motion 'It is recommended that the Governing Board of Trustees approve the replacement of the fence line at The Alternative Education Center with Bradley General Building, as presented.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 |
|
|
|
|
|
|