9.4 Consider Approval of Emergency Repair Work for Kitchen at Silver Valley HS with Bradley General Building
|
Strategic Plan:
|
|
Enclosure
|
BGB SVUSD Emergency Repair Quote.pdf
|
File Attachment:
|
|
Summary:
|
The Silver Valley High School Kitchen preparation sink experienced a catastrophic drain issue causing the drain to backup, rendering the sink unusable. The SVHS kitchen is the main location that preps food for all the Valley school sites, and is critical in its function. SVUSD maintenance team attempted to remedy the issue to no avail. An outside contractor had to be called in to help. The floor drain is encased in 12" of concrete. The concrete had to be sawcut and jackhammered out on order to reveal the damaged drain piping, taking the better part of a day to remove. Work charges include, emergency call out, mobilization, labor, and repair of floor tiles to match surrounding tile. Work has been completed.
|
Funding:
|
CNS Funds: $7800.00
|
Recommendation:
|
I Recommend Approval of Emergency Repair Work for Kitchen at Silver Valley HS with Bradley General Building
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Robert Saffel - Senior Director of Technology, Maintenance and Operations
|
|
Signed By:
|
|
Robin Schreiner - Senior Director, Business Services
|
|
Signed By:
|
|
Marc Lacey - Assistant Superintendent, Administrative Services
|
|
Signed By:
|
|
Jesse M. Najera - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Lynn McKee Moved, Member Brian Boatwright seconded to approve the Original motion 'I Recommend Approval of Emergency Repair Work for Kitchen at Silver Valley HS with Bradley General Building'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0. | The motion Carried 4 - 0 |
|
|
|
|
|
|